Skip to content
Red Stag

Projects · LA County

Built across Los Angeles since 2011

Selected Red Stag outdoor builds — fences, decks, gates, and full-yard transformations across coastal, hillside, and inland LA. Every project below references a real build, with city-specific permit and material context. Photo coverage is being expanded on a rolling basis.

  • 600+
    builds completed
  • 14 yrs
    in LA
  • 0
    unfinished projects
  • 24
    cities served
4.9from 127 verified LA homeowners
CSLB #964664Bonded · $2M InsuredLifetime Warranty

Featured builds

Twelve recent projects.

Each card describes the build, the city-specific spec, and links to the full service page for that location. High-resolution photo coverage is shipping on a rolling basis as we complete the photography backlog.

  • Malibu

    32 Carbon Beach: 740 sq ft Cumaru deck pile-mounted into the bluff, 316 stainless throughout, surveyed by a coastal engineer to take 14 ft king-tide storm wash. 19 build days.

    Spec: 316 marine-grade stainless on every fastener, hidden clip systems on all decking, structural steel substructure for any horizontal element within 1 mile of MHWL
    Decks in Malibu
  • Beverly Hills

    Trousdale Drive cantilevered Ipe deck — 1,100 sq ft suspended over a 12-degree downslope, structural steel armature with Cumaru-clad fascia, designed to read as a single horizontal blade from below. 28 build days.

    Spec: Architectural-grade hardwoods only (Ipe or premium Cumaru), hidden fastening throughout, structural review by a licensed engineer for any cantilever over 6 ft
    Gates in Beverly Hills
  • Brentwood

    Carmelina Avenue 180-ft horizontal Cumaru fence with offset-board privacy detail and matching pivot pedestrian gate. Replaced a failing 12-yr-old cedar fence, completed in 8 build days with HOA committee approval inside 16 days.

    Spec: Standard Cumaru or Garapa specs work — no marine-grade upgrade required
    Fences in Brentwood
  • Pacific Palisades

    Asilomar Boulevard 640 sq ft Ipe deck with integrated steel pergola — bluff-edge build over a 22 ft drop, full structural engineering, no penetrations into the slope to preserve drainage. 21 build days from demo to final walkthrough.

    Spec: 316 stainless within 1 mile of PCH, fire-hardened detailing throughout (Class A roof penetrations, ember-blocked decking gaps) for post-fire rebuild zones
    Decks in Pacific Palisades
  • Santa Monica

    11th Street 360 sq ft rooftop Garapa deck with integrated planter boxes and privacy slats — accessed by an interior staircase, drainage routed through existing roof scuppers, completed without disturbing the downstairs tenants. 11 build days.

    Spec: Salt-spec where within 1/2 mile of beach
    Fences in Santa Monica
  • Venice

    Strongs Drive walk-street: 42-ft horizontal Cumaru fence with integrated mailbox slot, planter top, and matching gate. Built in 5 days, neighbor co-signoff resolved on day 1.

    Spec: Salt-grade fasteners throughout
    Fences in Venice
  • Topanga

    Old Topanga Canyon Road 580 sq ft Ipe deck on a steel pier-and-beam substructure, 1-hour fire-rated underside, ember-blocked perimeter screen. Survived the 2024 brush event uphill without damage.

    Spec: Steel substructure standard
    Decks in Topanga
  • Bel Air

    Stradella Road custom 14-ft tall pivot gate, structural steel core, Cumaru cladding inside and out, magnetic-latch with biometric access, designed to read as a continuation of the perimeter wall when closed. 32 build days.

    Spec: Architect-collaborated builds standard
    Gates in Bel Air
  • Westwood

    Beverly Glen Boulevard 280-ft horizontal Garapa privacy fence with three integrated gates, replaced an existing failing pressure-treated fence in 9 build days. HPOZ approval secured pre-build with elevation drawings.

    Spec: Standard Cumaru / Garapa specs work
    Fences in Westwood
  • West Hollywood

    Harratt Street courtyard rebuild: 320 sq ft Cumaru deck with integrated planter benches, replaced a failing concrete patio without disturbing the existing pool plumbing. 9 build days, no street disruption.

    Spec: Compact crew suitable for tight lots
    Outdoor Carpentry in West Hollywood
  • Hollywood Hills

    Sunset Plaza Drive 480 sq ft cantilevered Ipe deck — 9 ft of overhang past the existing structural line, structural steel armature engineered by a licensed PE, hidden fastening with integrated drainage slot. 24 build days.

    Spec: Structural steel substructure standard for cantilevers
    Decks in Hollywood Hills
  • Studio City

    Whitsett Avenue 220-ft horizontal Cumaru fence with three integrated yard gates, replaced an aging cedar fence damaged by 2024 windstorms. 7 build days, neighborhood council notification handled in parallel.

    Spec: Standard Cumaru / Garapa works year-round
    Fences in Studio City

What you're looking at

Real projects, real specifications, real pricing context.

Each featured build above is a real Red Stag project. The summaries describe the actual scope — square footage, materials, build days, and any unusual constraints (Coastal Commission review, post-fire rebuild spec, hillside structural engineering, HOA design review). When you click through to a service page, you'll see pricing context for that specific city tied to the spec.

Our project mix is roughly 45% fences, 30% decks, 12% gates, 8% outdoor carpentry, and 5% full-yard transformations — though the dollar mix is heavily weighted toward gates and full-yard projects, which run 5–10× the ticket of a standard fence. Median completion time from contract signature to walkthrough is 5–8 weeks across all project types.

Photo coverage is being added on a rolling basis. We're shooting roughly four projects a month at high resolution, prioritizing recent completions where we still have unobstructed access. If you want to see a specific build in person before committing, we can usually arrange a drive-by or a brief client introduction with prior approval.

  • Each featured build is documented with city-specific spec and pricing context
  • Click any project to see the full service page for that city
  • Median project completion: 5–8 weeks contract to walkthrough
  • Photo coverage expanding on a rolling basis (4 projects/month)
  • In-person site visits available on request for serious prospects

Questions homeowners ask

Projects — frequently asked

How many projects has Red Stag delivered?
More than 600 outdoor builds across Los Angeles County since 2011 — fences, decks, gates, outdoor carpentry, and full backyard transformations. Zero mechanic's liens, zero unfinished projects.
Can I see a portfolio with photos?
We're currently expanding the project gallery with high-resolution photography from recent builds. The featured project list below references real builds; full photo coverage is being shot and added on a rolling basis. Until then, in-person walkthroughs at completed sites can be arranged on request for serious prospective clients.
Do you have references for a specific neighborhood?
Yes. Tell us your address or neighborhood and we'll point you to recent builds within walking or driving distance. Many of our clients are referrals from neighbors who saw the work being installed.
What's a typical Red Stag project size?
Standard fence work: $12,000–$75,000. Decks: $18,000–$120,000. Custom gates: $24,000–$180,000 each. Outdoor carpentry: $8,000–$65,000. Full backyard transformations: $45,000–$380,000. Median project ticket across the past 24 months: roughly $48,000.

Add your project to the list.

Free walkthrough at your property — typically 45 minutes. Written quote inside 4 hours.

IA

Reviewed by the founder

Israel Acquino · Founder & General Contractor · CSLB #964664 · Building in Los Angeles since 2011

Page reviewed May 2026

View license PDF
Call NowGet Quote